Basement floor

| No Comments | No TrackBacks

After finishing the upstaits wiring on September 11 I finally started putting the basement back together again. I finished pulling nails from the ceiling on September 24. It took me about 4 hours to do that. It was all the nails that were holding the dywall up. I also did some small cleanup in prep for the new floor.

I had bought 160 2'x2' sheets of dricore at the end of July. They have been sitting and waiting. On Sept 28 I got started with the floor. I did a couple of rows a night. I got a bunch done on Oct 1. Then I finished it on Oct 4 on my day off. The amazing thing is I used all or part of 158 sheets. I dare say pretty good calculation on my part. I had parts of 5-10 sheets left, but only the 2 totally unused. I would rather have two left than need two.

No TrackBacks

TrackBack URL: http://www.hoyty.com/MovType/mt-tb.cgi/385

Leave a comment

About this Entry

This page contains a single entry by Brian Hoyt published on October 6, 2005 10:38 PM.

Heights, Ladders and Antennas was the previous entry in this blog.

TV Glitch? is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.