After finishing the upstaits wiring on September 11 I finally started putting the basement back together again. I finished pulling nails from the ceiling on September 24. It took me about 4 hours to do that. It was all the nails that were holding the dywall up. I also did some small cleanup in prep for the new floor.
I had bought 160 2'x2' sheets of dricore at the end of July. They have been sitting and waiting. On Sept 28 I got started with the floor. I did a couple of rows a night. I got a bunch done on Oct 1. Then I finished it on Oct 4 on my day off. The amazing thing is I used all or part of 158 sheets. I dare say pretty good calculation on my part. I had parts of 5-10 sheets left, but only the 2 totally unused. I would rather have two left than need two.