Main Gallery 2 >>

Before any work

This shows the area from the proposed seating position.

Before any work

This is from the screen location.

Before any work

From the closet for water meter.

Before any work

From the back door.

Day 1 Demo

You can see there is no back on this wall, dilemma 1.

Day 1 demo

Again you can see there is no back on this wall, here you can see the back of the peg board.

Day 1 Demo

Here you can see the lovely Styrofoam insulation used.

Day 2 demo

More pictures of empty wall

Day 2 demo

More pictures of empty wall

Day 2 demo

Work are back

Day 2 demo

Work area back

Day 2 demo

Wall where screen will go with window, which will be covered over.

Day 2 demo

After I have removed the Styrofoam. You can see some of the glue still.

Day 2 demo

After I have removed the Styrofoam. You can see some of the glue still.

Day 2 demo

Here you can see some of the amazing wiring work.

Day 2 demo

You can see into the water meter. Also notice extra boards sort of part of the framing.

Day 2 demo

Water meter closet

Day 2 demo

Back wall where DVD racks will go.

Day 2 demo

Corner where arcade will go.

Day 2 demo

The beautiful sump pump area.