Rough In: December 2005 Archives

This morning after slacking off a few days I finished the last of the insulation. I filled every gap or nook with some type of insulation. Hopefully this will help with both sound isolation and cooling or heating bills. I used CertainTeed insulation all around. I used their R-13 smart roll with vapor barrier for all the external walls. Then I used kraft faced R-19 on the internal 2x6 walls as well in all ceiling joists. I am just happy to be done with fiber glass, I can't wait until the drywall is in to truly be rid of it.

The rest of the day I think I will finish the integrity gaskets. Then if I still have time I will either test the speaker wires or the Ethernet and Satellite wires.

About this Archive

This page is a archive of entries in the Rough In category from December 2005.

Rough In: November 2005 is the previous archive.

Find recent content on the main index or look in the archives to find all content.