I got some quick patch concrete today. I had cleaned out the broken bits from the upper corner. I then patched it with the new concrete and smoothed it as best as possible. Placing concrete on a vertical surface is challenging. Especially with floor boards above limiting your manuverability. There is a picture of my handy work in gallery 3.
I then went around with a bottle of concrete filler to try and patch the cracks around the basement. Hopefully these will work to help me keep my basement dry.
