Wiring continues

| No Comments | No TrackBacks

Last night and tonight I continued working on the electrical wiring mostly and a little time on speaker wiring. I have run 3 of the 5 circuits back to the panel. I have extended them to all their locations to prep for drywall. I am about 30% done with electrical, since I haven't started on the 12-15 recessed lights I need to do. However many of the lighting runs will be much shorter.

No TrackBacks

TrackBack URL: http://www.hoyty.com/MovType/mt-tb.cgi/410

Leave a comment

About this Entry

This page contains a single entry by Brian Hoyt published on November 9, 2005 10:39 PM.

Riser Build was the previous entry in this blog.

Odds and Ends 2 is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.