Last night and tonight I continued working on the electrical wiring mostly and a little time on speaker wiring. I have run 3 of the 5 circuits back to the panel. I have extended them to all their locations to prep for drywall. I am about 30% done with electrical, since I haven't started on the 12-15 recessed lights I need to do. However many of the lighting runs will be much shorter.
Wiring continues
No TrackBacks
TrackBack URL: http://www.hoyty.com/MovType/mt-tb.cgi/410

Leave a comment