Ok now 98% done

| No Comments | No TrackBacks

I have finished all the wiring I can at this point. I finished and tested the fifth circuit along with my square lights. The only thing left to do is the sconces and the switch for the lights in the riser.

After the wiring I went back to insulation. I worked on the insulation in ceiling joists. I got about 60% of the ceiling insulation done. It isn't hard but very time consuming work. Measure, cut, stuff, pull and repeat. Hopefully I can get it done tomorrow as it is the last thing that needs to be done prior to drywall install. Speakng of which I will hope to find someone next week to do the install.

No TrackBacks

TrackBack URL: http://www.hoyty.com/MovType/mt-tb.cgi/430

Leave a comment

About this Entry

This page contains a single entry by Brian Hoyt published on November 27, 2005 8:11 PM.

Electrical 95% Done was the previous entry in this blog.

Insulation 98% done is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.