I have finished all the wiring I can at this point. I finished and tested the fifth circuit along with my square lights. The only thing left to do is the sconces and the switch for the lights in the riser.
After the wiring I went back to insulation. I worked on the insulation in ceiling joists. I got about 60% of the ceiling insulation done. It isn't hard but very time consuming work. Measure, cut, stuff, pull and repeat. Hopefully I can get it done tomorrow as it is the last thing that needs to be done prior to drywall install. Speakng of which I will hope to find someone next week to do the install.

Leave a comment