Today I worked on wiring again for about 6-7 hours. At this point I have all electrical back to the panel. I also have all but the front right and sub speaker wires run. I finished up the Satellite and Ethernet wires as well. I had just enough of one Ethernet spool, the dual coax and the dual coax / dual Ethernet combo for the runs I needed. Each spool ran out with a few feet extra, which worked out well. I only have one Ethernet and a single coax spool left. The only wiring I have left is for the individual lights, which is still a bit. I am waiting for the lights to come in so I can place them and then run wires. Luckily none of the runs left have to go all the way back to the panel which makes it easier.
I also cut all the shelving I am going to place into the wall in various places. I am going to have a shelf in the column for the gas meter to hold TV DVD's. Then I will have a shelf near the front door for recent DVD's. Lastly will be a shelf near the front row of seating for game controllers, which will also have a hole to route cables through.

Leave a comment