Friday night and Saturday I tried to do as much as I could to get ready for next steps. I continued to tidy up and tighten up various wiring bits. Along with that I keep trying to think of all the possibilities I can to plan for the future. As I do that I add another box here, some 12/2 there and even some 18/4. I ran through my second 250 ft roll of 12/2 and had to get a third. I used a good chunk of the first roll on upstairs however the majority of first roll and second are in basement. A whole lot of electrical wires running around.

In between the wiring I would work on insulation. I finished up a bit more of the external block walls, there are a few empty pieces left waiting for potential wiring. I then completed all of the 2x6 walls. I stapled the kraft facing up as well. I started on the ceiling after that. I am filling the joists with R19 as well wherever I can. Especially the gap from the main room to the laundry room.

The last thing I worked on was mounting Integrity Gaskets on all the walls and ceilings in the theater area at least. Depending on what I have left over I will try to work on the rest of the room. This product is supposed to help stop sound transmission at least a little and it is fairly cheap and very easy to install. It looks very much like a green version of the 3M double sided sticky tape (IG is only sticky on one side). I don't know how much it will help, but I am sure it can't hurt.

No TrackBacks

TrackBack URL: http://www.hoyty.com/MovType/mt-tb.cgi/420

Leave a comment

About this Entry

This page contains a single entry by Brian Hoyt published on November 20, 2005 11:27 PM.

Shelves, wiring and insulation was the previous entry in this blog.

Lights are in is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.