Sunday the 22nd my dad and I got up again about 6:30 and started about 7. We started with the last section of the back wall that went from the outside door to the side wall. This wall had a window in it as well. It was also further complicated by the existing sump pump pipe. We next built the small wall section of wall that goes between the fireplace and the front wall. This wall has a heat/ac duct and water shut off valve for outside in it. We basically had to build the wall short on one side. This is where we stopped for the day. I had to go to work and my dad needed to leave to get home, he can't drive at night any longer.