Wall Building Day Four

| No Comments | No TrackBacks

Sunday the 22nd my dad and I got up again about 6:30 and started about 7. We started with the last section of the back wall that went from the outside door to the side wall. This wall had a window in it as well. It was also further complicated by the existing sump pump pipe. We next built the small wall section of wall that goes between the fireplace and the front wall. This wall has a heat/ac duct and water shut off valve for outside in it. We basically had to build the wall short on one side. This is where we stopped for the day. I had to go to work and my dad needed to leave to get home, he can't drive at night any longer.

No TrackBacks

TrackBack URL: http://www.hoyty.com/MovType/mt-tb.cgi/400

Leave a comment

About this Entry

This page contains a single entry by Brian Hoyt published on October 27, 2005 11:26 AM.

Wall Building Day Three was the previous entry in this blog.

Odds and Ends is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.