Waterproofing

| No Comments

I called a water proofing company on July 29th to schedule an estimate. I want to make sure there aren't any problems that need to be fixed before I start rebuilding. I don't want to have to rip anything out later if at all possible. I will wait and see what they say and then possibly get some other estimates from companies that have been recommended. They are coming Monday evening to inspect.

When I pulled down the stud walls I found one interesting section. Most of the studs had been redone at some more recent point. One pair in a corner though were obviously much older. Behind them was a discolored wall as well as some crumbling of the block wall near the top. You can see a picture of it here. Luckily most of the rest of the wall is in pretty good condition.

Leave a comment

About this Entry

This page contains a single entry by Brian Hoyt published on July 31, 2005 2:22 PM.

Stud wall removal - Part 2 was the previous entry in this blog.

New Floor is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.